Technical Due Diligence: What Investors Check Before Writing a Check

Technical Due Diligence: What Investors Check Before Writing a Check

A Series B SaaS company was three weeks from closing a €15 million round. The lead VC sent in a technical due diligence team — two senior engineers who spent five days auditing the codebase, infrastructure, and engineering processes. They found: zero automated tests, API keys hardcoded in the frontend JavaScript, a single-server deployment with no failover, and the entire database accessible without Row-Level Security. The investment was downgraded to €5 million with a mandatory €2 million earmark for engineering remediation. The founders lost 40% of their expected valuation because they treated code quality as optional.

Technical due diligence is no longer a formality. Stripe’s Developer Coefficient study — a large-scale survey of professional developers still cited as the benchmark reference on engineering time loss — found that developers spend an average of 17.3 hours of a 41.1-hour work week, roughly 42%, dealing with technical debt and bad code. That is not an abstract inefficiency; it is exactly the maintenance burden a buyer inherits the day the deal closes, and sophisticated investors now price it in before they sign. What a due diligence team finds determines whether you close at your asking price, close at a discount, or do not close at all.

CB Insights’ long-running analysis of VC-backed company shutdowns puts “no market need” and weak product-market fit at the top of the failure list — but among the startups that do find their market, execution risk buried in the codebase is precisely what a technical audit exists to surface before a term sheet becomes a wire transfer.

What Auditors Actually Look At

Technical due diligence teams typically evaluate seven areas, each weighted by how likely it is to kill the deal:

1. Code Quality and Architecture (High Impact)

Auditors clone your repository and start reading. They are looking for:

  • Consistent code style — does the codebase look like it was written by one team with shared conventions, or by 15 freelancers who never talked to each other?
  • Separation of concerns — is business logic cleanly separated from infrastructure code? Can they understand the data flow by reading the directory structure?
  • Technical debt density — are there TODO comments from 2024 that were never addressed? Are there “temporary” workarounds that became permanent?
  • Framework currency — are you running on supported, current versions of your frameworks, or are you two major versions behind with known vulnerabilities?

2. Test Coverage (Deal Breaker)

The presence or absence of automated tests is the single strongest signal of engineering discipline. Auditors run your test suite and check:

  • Coverage percentage — 80%+ for business logic is the benchmark. Near-zero test coverage is consistently treated by technology M&A advisors as one of the findings most likely to trigger a valuation haircut, because it converts every future release into an unquantified risk.
  • Test quality — are tests actually testing meaningful behaviour, or are they trivial assertions that inflate coverage numbers?
  • CI integration — do tests run automatically on every pull request, or are they run manually (if at all)?
  • Delivery performance against known benchmarks — DORA’s State of DevOps research (Google Cloud’s long-running study of software delivery performance, the basis for the “Accelerate” research programme) classifies engineering organisations into four performance tiers. Elite performers deploy on demand with lead times under a day, a change failure rate around 5%, and recovery from a failed deployment in under an hour. Low performers sit at a roughly 64% change failure rate and can take a month or longer to recover from an incident. A due diligence team that pulls your deployment logs is, in effect, checking which tier you fall into — and a startup clustered with “low performers” on these metrics faces harder valuation conversations regardless of what the pitch deck claims about engineering velocity.

3. Security Posture (Deal Breaker)

Auditors will specifically check for:

  • Exposed API keys and secrets in source code or version history
  • SQL injection and XSS vulnerabilities in user-facing endpoints
  • Authentication and authorisation implementation
  • Data encryption at rest and in transit
  • Dependency vulnerabilities (unpatched CVEs)
  • GDPR and data privacy compliance

Finding a single hardcoded production API key in a public repository is, in our experience advising founders through diligence, often enough on its own to reopen valuation negotiations — not because the fix is expensive, but because it signals that nobody on the team owns a secrets-management process, which auditors read as a proxy for how the rest of the codebase was built.

4. Infrastructure and Deployment (High Impact)

  • Deployment automation — can you deploy to production with a single command, or does it require manual SSH access and prayer?
  • Environment separation — do you have distinct development, staging, and production environments?
  • Disaster recovery — automated backups, tested restoration procedures, defined RTO (Recovery Time Objective) and RPO (Recovery Point Objective)
  • Monitoring and alerting — can you detect production issues before your customers do?

5. Scalability (Medium Impact)

  • Can the application handle 10x the current traffic without a rewrite?
  • Are there obvious performance bottlenecks (N+1 queries, missing database indexes, no caching)?
  • Is the infrastructure horizontally scalable (can you add servers) or vertically limited (one big server that cannot grow)?

6. Documentation (Medium Impact)

  • Architecture documentation that a new engineer can use to understand the system
  • API documentation for any external-facing interfaces
  • Runbooks for common operational procedures (deployment, rollback, incident response)
  • Architecture Decision Records explaining why key technical choices were made

7. Team and Process (Medium Impact)

  • Version control practices — meaningful commit messages, feature branches, code reviews
  • Development process — sprint cadence, backlog management, definition of done
  • Knowledge distribution — is all critical knowledge in one person’s head (bus factor of 1)?

The Pre-Due Diligence Checklist

If you are planning to raise a round or position for acquisition in the next 12 months, start preparing now. Here is the checklist:

Area Minimum Standard Time to Fix
Test coverage 60%+ on business logic 4-8 weeks
Secret management Zero hardcoded credentials 1-2 days
CI/CD pipeline Automated build, test, deploy 1-2 weeks
Database security (RLS) Row-level security on multi-tenant data 1-3 weeks
Monitoring Error tracking + uptime monitoring 2-3 days
Documentation Architecture overview + API docs 1-2 weeks
Dependency updates No critical CVEs in dependencies 1-3 days
Backup and recovery Automated daily backups, tested restore 2-3 days

The Red-Flag Severity Framework

Not every finding in a technical due diligence report carries the same weight, and founders who treat every item on the auditor’s list as equally urgent waste their remediation budget on the wrong fixes. Experienced diligence teams implicitly triage findings into four severity tiers — making that triage explicit lets you prioritise the same way the auditor will read your report.

Severity Definition Typical Findings Deal Impact Realistic Fix Window
Tier 1 — Deal-Killer Findings that create legal, regulatory, or existential business risk No version control; customer PII exposed without authentication; fraudulent/inflated usage metrics; GPL-licensed code embedded in a proprietary product without disclosure Deal paused or withdrawn until resolved and independently re-verified Cannot be fixed on a pre-close timeline in most cases — this is why founders must catch these long before a term sheet
Tier 2 — Major Valuation Hit Findings that do not kill the deal but materially change the risk-adjusted price Zero or near-zero automated test coverage on core business logic; hardcoded secrets in source history; single point of failure (bus factor of one); no tested backup/restore process 15–40% valuation discount or a remediation escrow held back from the closing amount 4–8 weeks with focused engineering effort
Tier 3 — Fixable Pre-Close Findings that a competent team can visibly remediate within the diligence window itself Missing CI/CD automation; no environment separation (dev/staging/prod); outdated but not critically vulnerable dependencies; thin documentation Minor renegotiation leverage if unresolved; largely neutralised if fixed and demonstrated before the term sheet is finalised 1–3 weeks
Tier 4 — Post-Close Remediation Findings that are noted but reasonably deferred to after the investment closes Suboptimal but functional architecture; incomplete API documentation; moderate technical debt in non-critical modules Typically written into the 100-day post-close plan, not the price 3–6 months, funded from the round itself

The practical takeaway: a founder with four weeks before an audit should ignore Tier 4 entirely, treat Tier 3 as a checklist to clear, and focus disproportionate effort on anything that could plausibly be scored as Tier 1 or Tier 2 — those are the findings that move the number on the term sheet, not the ones that make the report longer.

Preparing With a Distributed Team

Preparing for technical due diligence is one of the highest-ROI activities a startup can undertake. At Manifera, our custom software development teams regularly help startups remediate technical debt and implement engineering best practices ahead of funding rounds.

Our Amsterdam-based architects conduct code quality assessments, while our Ho Chi Minh City engineers implement the fixes — a combination that delivers investor-ready code quality within 4-8 weeks at a fraction of the cost of European-only teams.

Get your codebase investor-ready — manifera.com/contact-us.


FAQs

How long does a typical technical due diligence process take? (Scenario: Founder who just received a term sheet and the VC wants to conduct tech DD)

Most technical due diligence engagements take 3-7 business days of active audit time, with a report delivered within 2 weeks. The VC typically sends 1-2 senior engineers or hires a specialised due diligence firm. They will request repository access, infrastructure documentation, and 2-3 hours of interviews with your engineering team. The process is faster if you have documentation prepared in advance — architecture diagrams, test coverage reports, and dependency audit results.

What is the impact of low test coverage on valuation? (Scenario: CTO whose startup has 15% test coverage and is entering Series A negotiations)

Low test coverage signals high risk — it means every deployment is a gamble and every new feature could break existing functionality without detection. In our experience, startups with near-zero test coverage receive valuations 20-40% below comparable companies with strong testing practices. The fix is surprisingly fast: focus on testing the 20% of code that handles 80% of business value (authentication, payment processing, core workflows). You can reach acceptable coverage in 4-6 weeks.

Should we hire a CTO before going through due diligence? (Scenario: Non-technical founder with a team of freelance developers)

Having a credible technical leader significantly improves due diligence outcomes. If hiring a full-time CTO is premature, consider a fractional CTO (part-time technical leader) for 3-6 months pre-fundraise. Their role: establish engineering processes, conduct a self-audit, remediate critical issues, and represent the technical team during due diligence interviews. Cost: €3,000-€8,000/month. This investment directly protects your valuation.

What do acquirers look for differently than VCs in technical due diligence? (Scenario: Founder considering acquisition offers)

Acquirers care about integration cost: how expensive is it to merge your technology into their existing stack? They evaluate: (1) Technology stack compatibility — does your stack align with theirs, or will integration require a rewrite? (2) Data portability — can customer data be migrated to their systems? (3) Key person dependency — if your lead developer leaves post-acquisition, can the acquirer maintain the system? (4) Intellectual property clarity — is all code written by employees or contractors with proper IP assignment agreements?

Can we remediate technical debt quickly before due diligence? (Scenario: CTO with 4 weeks before the due diligence audit begins)

Yes, but prioritise ruthlessly. Four-week sprint: Week 1 — remove all hardcoded secrets, update critical dependency vulnerabilities, enable automated deployment. Week 2 — write tests for authentication, payment, and core business logic (target 60% coverage on critical paths). Week 3 — set up monitoring (Sentry, uptime checks), implement database backup and tested restoration. Week 4 — document architecture, create API documentation, prepare a security overview document. This sprint will not fix everything, but it addresses the deal-killing red flags — using the severity framework above, the goal is clearing every Tier 1 finding and as many Tier 2 findings as the four weeks allow.

What is a “bus factor” and why do investors care about it? (Scenario: Solo technical founder preparing for a seed or Series A audit)

Bus factor is the number of people who could be hit by a bus (or simply resign) before the project stalls because critical knowledge lived only in their heads. A bus factor of one — usually the founding engineer — is one of the most common Tier 2 findings in early-stage due diligence, because it means the investor’s capital is contingent on one person’s continued availability and goodwill. Auditors probe for it by checking commit history concentration, asking who can explain the deployment process from memory, and looking for documentation that would let a new hire operate the system without that person. Raising your bus factor above one — through documentation, pairing, and deliberately spreading ownership of critical modules — is one of the highest-leverage fixes available in the run-up to a raise, because unlike test coverage it can often be meaningfully improved in weeks, not months.

How useful was this post?

Share it with your friends

Get our latest articles here!

Thank you for subscribing to our blog!

Do you have any questions?

Help us improve the content of this Insightful blog by asking us questions. Manifera's team of experts will help you answer these questions as soon as possible.

    What is Refresh icon

    Contact